Whitehead & Associates Mid-North Coast prepared a Wastewater Management Report (WMR) regarding the existing On-site Sewage Management System (OSMS) servicing an existing dwelling at Boambee. The assessment was undertaken with reference to Coffs Harbour City Council, On-site Sewage Management Strategy (2015), AS/NZS 1547: On-site Domestic
Whitehead & Associates were engaged to provide an On-site Wastewater Report for Myall River Camp facility at Hawks Nest NSW. Given the remote location, and the ‘eco-tourism’ certification of the camping facility, passive (low power) and off-grid solutions were prioritised.
Whitehead & Associates were engaged to provide an On-site Wastewater Servicing Plan for a proposed Motor Cross facility at Upper Fine Flower NSW. Scope of Work included Site and Soil Assessment, System Sizing, Selection and Design, On-site Wastewater Plan (and Report) and Constructability Assessment. Whitehead
Modelling using MEDLI2 and advice for recycled Water Schemes at Box Hill and Huntlee. Review of the IMP documents and analysis of 12 months data for each scheme. W&A used industry best-practice modelling tools to examine the ongoing sustainability of the recycled water irrigation zones
Whitehead and Associates completed a Tier 2 buffer assessment for a rural residence in a special water supply Catchment at Knockwood Victoria. As part of the investigations for this Project a Site and Soil Assessment was completed as well as identifying System Suitability and Sizing
This project involved a site and soil assessment and preparation of a wastewater management report for a three (3) bedroom dwelling in a heavily flood impacted property fronting the Manning River. To overcome these limitations, secondary treatment and raised subsurface irrigation was proposed.
This project involved a site and soil assessment, and the preparation of a wastewater management report for two (2) off-grid moveable van-homes, completely serviced by solar power. A reed bed treatment system and evapotranspiration (ETA) bed was proposed to ensure a no-power on-site sewage management
This project involved a site and soil assessment, and the preparation of a wastewater management report for an off-grid three (3) bedroom dwelling, completely serviced by solar power. A reed bed treatment system, pump-well, and subsurface irrigation was proposed to ensure a low-power solution was
This project involved a site and soil assessment and the preparation of a wastewater management report for the alteration of a function shed to a two (2) bedroom dwelling. A secondary treatment system and raised subsurface irrigation area was proposed due to shallow soils at
This project involved a site and soil assessment and the preparation of a wastewater management report for a two (2) lot subdivision and the development of a three (3) bedroom dwelling. The Site is intersected by Melaleuca Creek in the West, contains surface water features,
This project involved a site and soil assessment and the preparation of a wastewater management report for the proposed residential subdivision at 3183-298 McDonalds Road, Pokolbin. The Site contains multiple dams, a drainage channel, and is intersected by Middle Creek in the southwest. The Site